"The design process is integral to the work produced, creating architecture that is responsive to the site through the development of the brief and concept with the client."

 

17/03/22

BLUE COAT CHURCH OF ENGLAND SCHOOL 

BCCES.jpeg

We are delighted to be working with Blue Coat Church of England School and Music College in Coventry to develop design for their next sixth form centre. The building will include 8 general teaching classrooms, breakout and support spaces.

02/01/22

MILLBAY ACADEMY

visual

New extension to existing Millbay Academy including 8 number classrooms and group spaces. The project has been designed to work sensitively with the existing building. The new extension has been elevated to allow covered play space underneath 

The project has been submitted for planning and is due to start on site September 2022

13/01/22

WESTWOOD ACADEMY

IMG_9063_edited.jpg

We are delighted to have been commissioned by Westwood Academy in Coventry to develop design for various expansion projects. This includes a new changing block and refurbished Art , Design and technology and general teaching spaces . The project is due to start on site April 2022

24/09/21

MERRITS BROOKS SCHOOL

IMG_8786-preview.JPG

Project complete at Merritts Book 2FE Primary School project in Birmingham great work Interserve Construction Ltd, Nolan Associates, Hoare Lea, and David Paradine.

26/11/21

SYMPHONY HALL ENTRANCE 

close up axo

We are delighted to be commissioned by Symphony Hall to design a new entrance space at the existing Symphony hall in Birmingham. The following Concept images are for the refurbishment of the lobby area.

29/09/21

EASTERN VILLAGE PRIMARY SCHOOL

01/10/21

Concept mass model

We are pleased to be commissioned by Eastern Villages Primary School for a 420 place Primary school (4-11) accompanied by a 72 FT places Nursery (3-4) this project will include external play space, Muga, and car parking.

30/06/21

UCB SUMMER ROW 

UCB

We are delighted to share the above proposed design visuals for the cafe bakery at UCB. 

UCB  SALON

02/07/21

UCB Salon

We are delighted to share she above proposed design visuals for the hair salon at UCB. 

30/07/20

GEM KINGSTON SCHOOL

SD.JPG

Feasibility for A new build 4 -11 primary, 2 FE (reception in its first year) mainstream school situated in the Royal Borough of Kingston Upon Thames, Surrey (South East and South London region). It is proposed to open in September 2022, and grow to full capacity of 420 in 2028.

CHANCE ACADEMY  

20/05/20

CH.JPG

Feasibility for A new permanent secondary school is based on 900 pupil places and will have a gross build area of 6,720sq.m within a site area of 9.186 acres (37,177sq.m).

WOODLANDS SCHOOL

30/07/20 

Woodlands visual 4.jpg

We have been commissioned to develop a strategic masterplan to identify opportunities for a new teaching block. Project has gained planning approval.

14/05/20

THE GRYPHON SCHOOL

IMG_3698.JPG

New kindergarten project under construction in Luzhou City. Project developed in collaboration with Choral Studio.

We are delighted to have been commissioned by Gryphon School in Sherborne to develop designs for a new 12 classroom teaching block and support space. Another great project to be involved with. Above are the design visuals.

12/05/20 

KINDERGARTEN SCHOOL - LUZHOU

choral.jpg

FEATURED

01/03/22

UNIVERSITY COLLEGE BIRMINGHAM JAMES COND BUILDING 

building front_Post.jpg
Axo sun gf_Post.jpg

Planning approval was achieved for the full refurbishment of the James Cond Building into a Construction Training Centre for University College Birmingham. The £10m project will include vocational training spaces to learn various construction techniques. We are delighted to have been appointed to develop the design through the technical and site stages.

27/01/22

PRESIDENT KENNEDY SCHOOL

President Kennedy School
11380_043.jpg
internal view

Construction complete at President Kennedy School in Coventry. Excellent work by BAM construction in delivering the project. Interior fit-out with feature timber ceilings installed by Joyce Reddington. We are very pleased with the outcome of the design.

05/01/22

RIVERBANK AND ERNESFORD GRANGE

Site progress

Ernesford Grange - Site progress photos of steelwork complete at Ernesford Grange a school in Coventry which includes 8 number general teaching spaces , seminar and breakout spaces and 300 P lecture theatre.

30/07/21

WOODLANDS SCHOOL

Woodlands visual 4.jpg

We have been commissioned to develop a strategic masterplan to identify opportunities for a new teaching block. Project has gained planning approval.

20/11/19 

KINGSNORTON GIRLS SCHOOL

Kings Norton Girls School
Corridor view

Completed project- new 480sqm teaching block. The new block includes general teaching, laboratories, reception and support spaces. 

21/12/19 

UCB EARLY YEARS

Early years

Completed project internal refurbishment of the existing 6th floor for University College Birmingham, Summer Row. 

19/11/19 

UCB PHASE 3

21/12/19 

UCB 5TH FLOOR CLINIC SPACE

Clinic 5th floor

Completed project internal refurbishment of the existing 5th floor for University College Birmingham, Summer Row. 

21/12/19 

UCB  6TH FLOOR - TEACHING SPACE

Teaching area

Completed project internal refurbishment of the existing 6th floor for University College Birmingham, Summer Row. 

21/12/19 

UCB PROSTHETICS SUITE

7th floor

Completed project internal refurbishment of the existing 7th floor for University College Birmingham, Summer Row. 

21/11/19 

UCB PHASE 3

The link.jpg

External render re-design for UCB phase 3.

03/01/2020

GREYFRIAR HOUSE

IMG_6649.jpg

Project completed for the refurbishment and extension of Greyfriar House which includes 80 bed space student accommodation in Coventry City Centre.

12/09/19  

WOLVERHAMPTON UNIVERSITY

Wolverhampton university

Refurbishment for the breakout areas and office spaces for Wolverhampton University.

12/07/19  

BOAT HOUSE, WARWICK

Boat house

The new HQ for 2nd Warwick Sea Scouts which includes the main hall, workshop and meeting space.

UCB PHASE 3
DSC_2865_19.12.05_LUCAS ARCH_UCB PHASE 3
DSC_2910_19.12.05_LUCAS ARCH_UCB PHASE 3

We are delighted with the completion of UCB Phase  3 - internal and external refurbishment of the 6 storey office building for University College Birmingham.

12/09/19 

FORTIS LIVING

Cafe Progress house
Fortis living
fortis
fortis

New build two storey 15,000 sqft build office block in Worcester, works include masterplan to include 3 industrial units 5,000 sqft each.